Well, today has been very very interesting…
It was time for official industry board meeting #2, with the guys from 3 Blokes, Wildfire and Pandemic returning to check on our progress and dole out their praise and/or punishment.
Today was a bit of a reality check, mostly in the scope of the project. While most of us were prepared for 2 movies and some still optimistic for 3, the industry suggested just sticking to the first and polishing it up to a glossy sheen. The advantage of this would be a slightly lower level of stress around the studio, and hopefully a much better end product.
The art, programming, design teams have been working much more cohesively so the studio dynamics have been great (with the occasional stress-induced exception). With the scope reduced I’m much more certain of our success ready for the presentation in 2 weeks.